Skip to content
Ark It Easy logo Ark It Easy
01 BIM in Practice

Why BIM adoption fails in architecture firms

And what the industry told me when I said so out loud.

I published a short post on LinkedIn with a claim I have believed for years:

The fastest way to kill BIM adoption in a firm is to force everyone to work 100% "the BIM way" from day one.

I have watched it happen. A firm decides to go all in. Every element modeled to LOD 400, every parameter filled, every workflow by the book. Six months later the team is slower than they were in AutoCAD, and everyone quietly hates Revit.

The problem was never the software. The problem was forgetting one thing: the tool should align to our goals, not the other way around.

The post reached about 35,000 people and collected more than 80 comments. Architects, BIM managers, structural technicians, MEP specialists, cost consultants, bridge designers. Some agreed. Several pushed back hard. A few made the argument better than I had.

This article is what came out of that. It is not the original post. It is the post after the industry got its hands on it.

First, the correction I had coming

A BIM coordinator made the point immediately: BIM is not a tool. Revit is the tool. BIM is a collaborative delivery methodology with defined workflows and information management principles.

By the book, he is right, and the distinction matters more than it sounds.

Because when leadership believes that buying Revit means "doing BIM," modeling everything by default starts to feel like progress. It isn't. It is just expensive drawing.

Another commenter made the same point from the other end: plenty of professionals, especially in civil infrastructure, run full BIM processes without ever opening Revit. If the methodology can exist without the software, the methodology was never the software.

So let me restate the claim properly.

Tool or methodology, it is still a means to an end. It exists to serve the project. And the moment it stops serving the project, someone has to be willing to say so.

The deliverable decides how you model

The strongest agreement in the thread came from people who had learned this the expensive way.

An architect in Sydney works on building permit approvals. Nobody approving his drawings cares about LOD purity. They care whether the design is buildable and compliant. Knowing when to draft something quickly instead of fully modeling it is what keeps the process from becoming the product.

An engineer in the thread works in rail infrastructure. His teams deliberately do not model everything. Electrical layouts are 2D or Excel. Mechanical fixings stay in 2D. Not out of laziness, but because nothing is built that the deliverable does not require.

A visualization artist who produces concept imagery put it from the client's side: the client is not concerned with the model, the software, or the method. They care about the final result.

And his two cases prove the same rule from opposite ends. For a render, the deliverable is the image, so the model only needs to serve the image. For site execution, the deliverable is buildable documentation, so now clean and usable geometry genuinely matters.

Same principle. Different output. The deliverable decides how you model, every time.

The counterweight, which is just as important

"Do not model everything" is not "do not model what carries cost or risk."

Another commenter raised the bill of quantities. If elements need to be discrete and countable for costing, they need to be discrete and countable. A project without dependable cost and installation data is not lean. It is exposed.

His own follow-up landed exactly where I would: placeholders where a placeholder is enough, full representation where the part is critical. It comes down to information need.

That is not a contradiction of everything above. It is the discipline of it.

A BIM specialist with seventeen years of experience gave the cleanest version of the whole idea:

The question is not "how much can we model." The question is "what information does the project actually need at this stage."

More detail is easy. The right detail is the skill.

Where the argument gets uncomfortable

Three people took the idea somewhere harder, and I want to give them the space rather than tidy them away.

The first asked the obvious question I had dodged. Can BIM always be aligned to our goals? In practice, he said, it often works the other way. We bend naming conventions, workflows, modeling strategies, sometimes even project decisions, to fit what the software can do.

He is right, and pretending otherwise would be dishonest.

Here is the line I would draw. Adapting how you work to a tool's limits is craft. Everyone does it. The danger is when the tool quietly starts rewriting what you deliver, and nobody notices the substitution happened.

The second went further, and his phrase has stayed with me: parameters added because the standard asks for them, with no clear answer to "what for," are not information. They are bureaucracy with geometry.

He also traced the chain all the way down. BIM serves the goals. The goals serve the contract. The contract serves the deliverable. And the deliverable serves a process nobody wants to question.

Which means the real courage is not choosing the right modeling method. It is daring to question the deliverable itself. That is uncomfortable. Transformation usually is.

The third asked the practical version. If the client wants something and your goals do not align with theirs, who is right? Why would a client work with you if you do not give them what they asked for?

Fair, and it deserves a straight answer.

The client's goal is theirs, always. Approved, buildable, on time, coordinated. I align to that completely. But "model everything to LOD 400" is not a goal. It is a method. Most clients do not actually care how you model. They care what they get.

When a client prescribes a method that will not serve their own outcome, delivering it anyway is not service. Guiding them to what they actually want is. That is the job.

The part that protects all of this

An architect in the thread added the sentence that keeps the whole argument honest:

Revit is just a tool, but you need to master the tool to be a master. Otherwise you are just an architect and a monkey in Revit.

"It is just a tool" is not a license to stay mediocre at it. The opposite.

You earn the right to say "draft that, do not model it" only after you genuinely know what Revit can do. Judgment without skill is guessing. And a team that skips the fundamentals will not produce better outcomes just because someone told them not to over-model.

Master the tool. Then make it serve you.

What this looks like in practice

If you are leading BIM in a firm, the useful questions are not about LOD levels. They are these:

What is the deliverable, actually? Not what the standard says. What leaves this office and what decision does it support.

Who needs this information, and for what? If nobody can answer "what for," you are producing bureaucracy with geometry.

Where is the team right now? Not where you wish they were. Implementation that ignores the actual starting point fails, every time. Phase it.

What can we stop doing? Done properly, ISO 19650 and Level of Information Need exist precisely to prevent over-production. A team that thinks the standard means "model everything" has been sold a bad version of it.

Have we earned the judgment? Cutting scope is only wisdom if you know exactly what you are cutting. Otherwise it is just cutting corners.

The point

The most important thing is not purity. It is control.

When you understand your team and your goals, you control the process. When you follow dogma, the process controls you.

We are architects. Not Revit monkeys.

And judging by eighty comments from people who build bridges, rail, hospitals and houses across a dozen countries, that is not a controversial opinion. It is just one that too few firms act on.

02 FAQ

Questions

Why does BIM implementation fail in architecture firms?

Most often because the office adopts a method before it defines its goals. Modeling everything to a high level of detail from day one slows the team down, and people go back to old habits.

How much should an architecture office model in Revit?

As much as the information the project needs at each stage. Model what the schedules, quantities and drawings read, and draft what only needs to be seen.

Is BIM the same as Revit?

No. Revit is a tool. BIM is a way of delivering a project with shared information and clear workflows. Buying Revit does not mean an office is doing BIM.

03 The author
Miljan Andjelkovic, architect and Autodesk Certified Instructor

About the author

I'm Miljan, an architect and Autodesk Certified Instructor. I spent four years at Sweco Architects in Stockholm, and today I set up Revit standards for architecture offices. Ark It Easy is where I teach that work, as an Autodesk Authorized Training Center.

in the Ark It Easy community
11,700+
on YouTube
29,000+
Autodesk Authorized Training Center
ATC

Ark It Easy for Teams

Moving your office to Revit, or fighting it? I set up templates, standards and project setup for architecture offices, and train teams on their live projects.