Skip to content
Ark It Easy logo Ark It Easy
01 Learning Revit the way offices use it

Documentation is still what an architecture office delivers

Why over-modeling is the most common Revit mistake, and how to balance the model and the information so the drawings come out clean.

Documentation is still what an architecture office actually delivers. It is also the part most people learning Revit skip.

I see the same pattern in students and in offices that have just moved to Revit. Everything gets modeled. Every skirting board, every piece of trim, every bracket, because the model is the thing you can see and modeling is the part that feels like progress. Nobody stops to ask what the plan will look like printed at 1:100.

Then the drawings are due. The plans are cluttered, the sections show things nobody asked for, and half the sheets need cleaning by hand. The office spends more time producing documentation from the model than it ever did without one. More often than anyone admits, the last step happens in AutoCAD. Export, tidy, submit. The model was for looking at.

Over-modeling comes from working hard

Over-modeling is probably the most common beginner mistake I see, and it is a strange one, because it comes from working hard. Nobody over-models out of laziness. They do it because adding things feels like progress, and because nobody told them where to stop.

The answer to "where do I stop" is not a number. LOD 300 written in a standard does not tell anyone whether to model the skirting. The drawing does. If an element appears in a schedule, it gets modeled with the information the schedule reads. If it only has to be seen at 1:100, a line in the right view is often enough. If it only matters at 1:10, it belongs in the detail, not in the model.

More detail is easy. The right detail is the skill.

The balance between the model and the information

What I teach my students and the offices I work with is a balance between the model and the information.

Take a wall type. A wall type that carries its fire rating, its acoustic class and its finishes as information is worth more to a project than a model where every cable tray has been drawn. The tags read it. The schedules read it. The drawings read it. Change the type, and every view follows.

When the information is set up that way, clean documentation is a view template and a few clicks, not a week.

BIM was never the modeled part only. The I in the middle is the part that was supposed to make the switch worth it.

Floor plan of the workshop house: two bedrooms with bathrooms at either end and an open living, dining and kitchen area in the middle.
The workshop house, inspired by Mazzini House by iHouse Estudio.

One model, several readers

A point that came up under the original post: drawings do not have one reader. The same model produces drawings for the permit office, for the contractor, for the client, and sometimes for a magazine. Each of them needs a different presentation, not the same sheet with a different title block.

In Sweden we had a national standard for line weights and drawing conventions, so the permit office was mostly taken care of if you followed the rules. The part people forget is everyone else. In Revit, that is the job of view templates and graphic standards set up per reader. When they are missing, everything gets exported and redrawn for the client, and the model stops being the source.

What people pushed back on

Two good objections came up in the discussion.

The first: over-modeling is not a Revit problem, it is a team communication problem. Agree on the outputs and the level of detail for each stage, and it goes away. I agree, and it is one of the first things I set up when I write standards for an office. In theory it should come from the client and run through the whole chain. In practice, in many countries, the architect ends up writing it for everyone and hoping the others read it.

The second: why deliver drawings at all? Some contractors already build from the model. I have been on that side. In Stockholm we were delivering model-based to site years ago. But "a little more organization in the model" is an understatement. A model a site builds from has to be right in a way a drawing never had to be, because there is no view where you can hide a mismatch. An office that cannot get clean documentation out of its model is not ready to hand that model to a site either.

What to do on your next project

Before you model anything beyond walls, floors and roof, open a sheet and place an empty plan at the scale you will print. Then ask three questions about every element you are about to model:

  1. Does it appear in a schedule? Model it, with the parameters the schedule reads.
  2. Does it only need to be seen at this scale? Draw it in the view, or let the family's detail level handle it.
  3. Does it only matter in the detail? Leave it for the detail.

Then set up one view template per drawing type before you place the first view on a sheet. That is where the week of cleaning goes away.

02 FAQ

Questions

What is over-modeling in Revit?

Modeling more geometry than the drawings, schedules and project stage need. It slows the model down and makes the documentation harder, not better.

Should I export Revit drawings to AutoCAD to finish them?

If you have to, the problem is in the template and the view setup, not in Revit. Fix it once there, and every project after it inherits the fix.

How detailed should a Revit model be?

As detailed as the drawings and schedules of the current stage need. The information on an element usually matters more than its geometry.

03 The author
Miljan Andjelkovic, architect and Autodesk Certified Instructor

About the author

I'm Miljan, an architect and Autodesk Certified Instructor. I spent four years at Sweco Architects in Stockholm, and today I set up Revit standards for architecture offices. Ark It Easy is where I teach that work, as an Autodesk Authorized Training Center.

in the Ark It Easy community
11,700+
on YouTube
29,000+
Autodesk Authorized Training Center
ATC

Ark It Easy Premium

Revit Foundations takes one complete project from an empty file to finished sheets, in the order an office works, with views, view templates, schedules and sheets. It is part of Ark It Easy Premium.

Today

$197/ year

From 1 December

$297

Join Premium